Master the language of completions with comprehensive definitions for DAC, MC-1, ITR, and other essential terms. Search, filter, and explore the terminology that drives successful project completions.
Showing 19 of 19 terms
Discipline Acceptance Certificate
HighA formal certificate confirming the acceptance of a discipline within a subsystem as Mechanically Complete.
Mechanical Completion Certificate
HighA certificate confirming that an entire subsystem is mechanically complete across all disciplines and is ready for pre-commissioning activities.
Pre-Commissioning Certificate - Level 1
HighA certificate confirming that a subsystem has successfully completed all pre-commissioning activities and is ready for commissioning.
Handover Certificate
CriticalThe final certificate confirming that an entire system has been fully pre-commissioned, with all subsystems complete, and is formally handed over to operations.
Inspection and Test Record - Level A
HighA record of construction inspection and testing activities performed on equipment or systems.
Inspection and Test Record - Level B
HighA record of pre-commissioning inspection and testing activities, typically more detailed than ITR-A.
Physical Walkdown Inspection
HighA physical inspection of equipment or systems to verify completion against design requirements.
Punch List / Snag List
MediumA list of items that need to be completed or corrected before a system can be considered complete.
Limit of System Handover
MediumThe defined boundary of what is included in a system handover package.
Equipment Tag / Identification Tag
CriticalA unique identifier assigned to equipment, instruments, or systems for identification and tracking.
Process System
HighA collection of related equipment that performs a specific function in the plant.
Process Subsystem
MediumA component of a larger system that performs a specific sub-function.
Completions Engineer
HighThe engineer responsible for managing the completions process for assigned systems or areas.
Commissioning Activities
HighThe process of bringing systems and equipment into operation by testing and verifying performance.
Pre-commissioning Activities
HighInitial testing and verification activities performed before full commissioning.
System Handover
CriticalThe formal transfer of completed systems from construction/commissioning to operations.
Operations Team
HighThe team responsible for operating and maintaining systems after handover.
Piping and Instrumentation Diagram
HighA detailed diagram showing the piping and instrumentation of a process system.
Drawing Register
MediumA comprehensive list of all drawings related to a project, including revision status.
Construction records
Mechanical completion
Pre-commissioning
Handover complete